N.A.S. Kodiak, Alaska Contract NOy 3570
-
nas1.jpg - Temporary Camp Site Looking North from 1939 Survey Bldg - 7Oct39
-
nas2.jpg - NAS Kodiak Admin and Mess Bldg T-1 looking NE from Chiniak SW-7Oct39
-
nas3.jpg - NAS Kodiak complete temporary camp. From right to left: T-7, T-4, T-3, T-6,
T-5, T-2, T-1. Looking SW toward Old Womens Mountain.
-
nas4, 5 &6.jpg
- Construction of temporary dock. Kodiak Fisheries Pile Driver - 7Oct39
-
nas7.jpg - SS Tanana unloading into luber boom in Womans Bay-Contract Noy 3570
-
nas7a.jpg - Close up of above: SS Tanana unloading into luber boom in Womans Bay-Contract Noy 3570
-
nas8.jpg - Temporary Dock looking east across Womans Bay - 4 Nov 39
-
nas9.jpg - Scows secured for night Womans Bay - 4Nov39
-
nas10.jpg - Fuel Storage, Ship Santiago and dock looking N aboard MS Freida - 15Nov39
-
nas11.jpg - First Ice Floating on Womans Bay - 15 Nov 39
-
nas12.jpg - Location for dry dirt dyke, looking east across Womans Bay - 4Nov39
-
nas13.jpg - Piles for Spillway for dry dirt dyke. Looking east across Womans Bay - 4Nov39
-
nas14.jpg - Panorama of storage area, part of area "A" - 4 Nov 39
-
nas15.jpg - Small warehouse bldg S-4 and power house bldg S-5 looking SW from the
road - 8 Nov 39
-
nas16.jpg - Area "A" with RD-6 caterpillar in foreground - 8Nov39
-
nas17.jpg - Setting a pole with D-8 caterpillar. Raising pole into position. 14Nov39
-
nas18.jpg - Placing the pole - 14Nov39
-
nas19.jpg - Tamping and climbing to unhook - 14Nov39
-
nas20.jpg - Alignment and All Clear - 14Nov39
-
nas21.jpg - Temporary dock, SS Mary D and SS Cordova - 21Nov39
-
nas22.jpg - Temporary dock, SS Mary D and SS Cordova and International Truck hauling
lumber - 21 Nov 39
-
nas22a.jpg - Close up of above: Temporary dock, SS Mary D and SS Cordova - 21 Nov 39
-
nas23.jpg - Grading area "A", Permanent camp area. Looking SE from flag pole - 4Nov39
-
nas24.jpg - Pole line & portable sub-station at N corner of permanent camp - 4Nov39
-
nas25.jpg - First dormitory bldg P-9, bearing walls, looking SW from N boundary of
camp - 21Nov39
-
nas26.jpg - First dormitory bldg P-9, bearing walls, looking SW from Chiniak SW - 21Nov39
-
nas27.jpg - Blasting in permanent camp area section of Area "A" - 29Nov39
-
nas28.jpg - Setting charges in rock hog back in permanent camp area. 23Nov39
-
nas29.jpg - 1st & 2nd floor studding from north corner - 25Nov39
-
nas30.jpg - 1st & 2nd floor studding from SW corner - 25Nov39
-
nas31.jpg - Building framed & scaffolding ready for homasote - 30Nov39
-
nas32.jpg - East side of building ready for trusses - 25 Nov 39
-
nas33.jpg - Panorama showing temporary camp-dormitory bldg P-11. Head of
Womans Bay - 29Nov39
-
nas34.jpg - Roof truss - 30Nov39
-
nas35.jpg - Wiring roughed in - 30Nov39
-
nas36.jpg - Rough Plumbing 1st floor - 30Nov39
-
nas37.jpg - Outside wall 1st floor -30Nov39
-
nas38.jpg - Outside wall 2nd floor - 30Nov39
-
nas39.jpg - Interior wall - 30Nov39
-
nas40.jpg - Exterior 2nd floor bathroom -30Nov39
-
nas41.jpg - Looking north along south side of bldg - showing homasote placement and
scaffolding 4Dec39
-
nas42.jpg - Looking South along north side of bldg showing homasote and
scaffolding - 4 Dec 39
-
nas43.jpg - Details of southeast corner showing homasote and flashings - 4Dec39
-
nas44.jpg - Details of corner showing homasote and flashing placement at joint of H. 4Dec39
-
nas45.jpg - Dormitory bldg P-11 looking S along E side of bldg. 15Dec39
-
nas46.jpg - Dormitory bldg P-11 looking east along S and W side of bldg. 15Dec39
-
nas47.jpg - Dormitory building P-11 looking W along E side of bldg. 15Dec39
-
nas48.jpg - Dormitory bldg P-11 second floor looking NE down corridor. 17Dec39
-
nas49.jpg - Dormitory bldg P-11 looking toward corridor from 2-man room. 17Dec29
-
nas50.jpg - Dormitory bldg P-11 second floor looking into reading room. 12/17/39
-
nas51.jpg - Dormitory bldg P-11 reading room looking into corridor. 12/17/39
-
nas52.jpg - Dormitory bldg P-11 looking N along S and E walls. 12/17/39
-
nas53.jpg - Hospital bldg P-7 looking east across site. Mud sill in place. 12/17/39
-
nas54.jpg - Permanent camp quarters site for quarters Ap to Up. 12/17/39
-
nas55.jpg - Looking east from quarters site across Chiniak Bay. 12/17/39
-
nas56.jpg - Looking N from quarters site toward devils prongs. 12/17/39
-
nas57.jpg - Looking W from quarters site toward Barometer Mountain. 12/17/39
-
nas58.jpg - Messhall bldg P-6 looking at S corner. 12/25/39
-
nas59.jpg - Messhall bldg P-6 looking at details of SW exterior wall. 12/30/39
-
nas60.jpg - Sewer ditch excavation on main in Permanent camp area from front of site of
Administration bldg P-1. 12/25/39
-
nas61.jpg - Showing ice on upper end of Womans Bay. 12/25/39
-
nas62.jpg - Messhall bldg P-6 showing marinite eastern wass, heating plant. Stack and
switch boxes. 12/30/39
-
nas63.jpg - Messhall bldg P-6 dining room showing interior ceiling and wall construction.
12/30/39
-
nas64.jpg - Messhall bldg P-6 showing interior ceiling & wall construction. 12/30/39
-
nas65.jpg - Marine barracks bldg P-5 showing studding, exterior walls complete to plates
on north & west sides. 12/30/39
-
nas66.jpg - Marine barracks bldg P-5 showing studding exterior walls complete to plates
on south and east walls. 12/30/39
-
nas67.jpg - Hospital bldg P-7 showing sub-flooring and fabrication of wall sections. 12/30/39
-
nas68.jpg - Hospital bldg P-7 showing erection of wall sections. 12/30/39
-
nas69.jpg - Marine barracks bldg P-5 showing portable homasote drying room and
portable saw shed. 12/30/39
-
nas70.jpg - Dormitory bldg P-11 showing SE corner of completed bldg. 1/5/40
-
nas71.jpg - Messhall bldg P-6 showing placement of homasote and scaffolding. 1/5/40
-
nas72.jpg - Radio Shack and poles. 1/5/40
-
nas73.jpg - Gridiron. 1/5/40
-
nas74.jpg - Skid driver from beach side looking toward site of NAS admin bldg. 1/5/40
-
nas75.jpg - Skid driver from bay side looking toward site of NAS admin bldg. 1/5/40
-
nas76.jpg - Front view of Bucyrus-Erie Hoe making cut on temporary camp sewer
ditch. 1/11/40
-
nas77.jpg - Side view of Bucyrus-Erie hoe making cut on temporary camp sewer
ditch. 1/11/40
-
nas78.jpg - Manhole and 12 inches wood stave sewer pipe. Taken from floor of ditch
to show covering. 1/11/40
-
nas79.jpg - Caterpillar D-8 bulldozer blades purchased on P.O. 13G from Hofius-Ferris
showing details of failures. 1/11/40
-
nas80.jpg - Caterpillar D-8 bulldozer blades purchased from Hosius-Ferris on P.O. 13G
showing failures. 1/11/40
-
nas81.jpg - Power house, bldg S-5, showing framing. 1/11/40
-
nas82.jpg - Dormitory bldg P-12, showing 2nd floor joists and bridging. 1/11/40
-
nas83.jpg - Dormitory bldg P-12 showing details of E exterior walls. 1/11/40
-
nas84.jpg - P&H shovel & international 5yd dump truck on excavation below
Road "B". 1/11/40
-
nas85.jpg - Dormitory bldg P-12 showing interior wall, stairwell and cross bracing in
wall. 1/11/40
-
nas86.jpg - Dormitory bldg P-12 showing details NE corner of exterior walls also noting
30 inch anchor bolt. 1/11/40
-
nas87.jpg - Part of panorama from point on East side of bay. N12500 E5700 looking
toward 2-step bulkhead and dredge.
-
nas88.jpg - Part of panorama from point on E side of bay-N12500 E5700 showing temporary
dock. 1/11/40
-
nas89.jpg - Part of panorama from point on E side of bay N12500E5700 looking toward
spillway. 1/11/40
-
nas90.jpg - Part of panorama showing shop area on E side of bay - N12500 E5700. 1/11/40
-
nas91.jpg - Part of panorama from point on E side of bay N12500 E5700 showing permanent
and temporary camp bldgs. 1/11/40
-
nas92.jpg - Looking E from station 220+50. Realignment of bridge. 1/23/40
-
nas93.jpg - Looking W from station 222+50. Existing bridge. 1/23/40
-
nas94.jpg - Looking N from station 190+00. Realignment. 1/23/40
-
nas95.jpg - Looking N from station 196+00. Realignment. 1/23/40
-
nas96.jpg - Looking west from station 185+50. Widening. 1/23/40
-
nas97.jpg - Looking E from station 185+50. Realignment & widening. 1/23/40
-
nas98.jpg - Devils Creek during flood. 1/23/40
-
nas99.jpg - Devils Creek bridge after flood. 1/23/40
-
nas100.jpg - Buskin River bridge & vicinity during flood. 1/23/40
-
nas101.jpg - Buskin River bridge showing shims over caps. 1/23/40
-
nas102.jpg - Part of panorama showing marine barracks, dispensary, quarters area and
temporary camp. Taken from point N14530 E4160. 1/31/40
-
nas103.jpg - Part of panorama showing Dormitory bldg P-11, messhall P-6, Dormitory P-12,
Dormitory P14 and Administration bldg P-1. 1/31/40
-
nas104.jpg - Part of panorama showing clearing for NAS Maintenance, motor test bldgs,
Road "B" and excavation. 1/31/40
-
nas105.jpg - Part of panorama showing location for warehouses, new powerhouse S-5,
general warehouse S-11, two step bulkhead and dredging area. 1/31/40
-
nas106.jpg - Dredge "Everett" making face cut along permanent dock. 1/31/40
-
nas107.jpg - Dredge "Everett" making face cut along permanent dock. 1/31/40
-
nas108.jpg - Center line. Road "B" slope from road to concrete apron 1.25:1. 1/31/40
-
nas109.jpg - P&H shovel making cut on 1.25:1 slope below road "B". 1/30/40
-
nas110.jpg - Bldgs P-12, P-11 & sills for dormitory P-14 taken from NE corner of radio
shack. 1/31/40
-
nas111.jpg - Fill along Road "C" looking east. 1/31/40
-
nas112.jpg - View showing water main coming down from storage tank showing concrete
anchor block at sharp angle point similar anchors were poured on all sharp
angles. 2/3/40
-
nas113.jpg - View showing water main coming down from storage tank showing concrete
anchor block at sharp angle point. 2.3.40
-
nas114.jpg - Hoe bucket on Bucyrus Erie 22B shovel. Chalk mark shows location & extent
of crack in yoke casting. 2/5/40
-
nas115.jpg - Hoe bucket on Bucyrus Erie Shovel 22B. Chalk mark shows location & extend
of crack in yoke casting. 2/5/40
-
nas116.jpg - Scow with derrick and equipment berthed on gridiron. 2/5/40
-
nas117.jpg - View into kitchen or messhall P-6 looking from Blue Room. 2/16/40
-
nas118.jpg - View of rock cut for sewer line at approx N15750 E6200. 2/5/40
-
nas119.jpg - Typical view of sewer line installation. 2/5/40
-
nas120.jpg - Marine Barracks P-5. View from SW. 2/16/40
-
nas121.jpg - Dispensary P-7. View taken from NW. 2/16/40.
-
nas122.jpg - View taken from intersection of Road "B" and Abberts Road showing footings
for Machine Shop S-2, framing for Warehouse S-11 and power house S-5 at
extreme right. 2/16/40
-
nas123.jpg - View showing 25.000 gal water tank next to 15,000 gal water tank. Also pipe
next to trench to be for pumping additional water from spring to storage. 2/16/40
-
nas124.jpg - Marine Barracks P-5, Dispensary P-7, road approaching cottage area, burning
brush in cottage area and Temporary camp. 2/16/40
-
nas125.jpg - Messhall P-6, dormitory P-11, P-12 & P-14, Admin bldg P-1 and fill connecting
Road "C" to Nymans Peninsula. 2/16/40
-
nas126.jpg - NAS Motor test bldg area to grade. Storage area, power line poles to Nymans
Peninsula and cut on Road "A". 2/16/40
-
nas127.jpg - Storage Area, footings for machine shop S-2, framing for warehouse S-11, Spill
way and two step bulkhead. 2/16/40
-
nas128.jpg - Show material in Pit #1 on Buskin Flat. Pit is located 100 ft N of North end of
Buskin River bridge. 3/1/40
-
nas129.jpg - Different view of nas128.jpg. 3/1/40
-
nas130.jpg - View showing Bachelor Officers Cottage, BOC 30% complete and cottages Fp,
10%; Jp, 10%; Jp, 15%; Ap, 8%; Cp, 6%, Ep, 3%. 3/2/40
-
nas131.jpg - Marine Barracks P-5, Dispensary P-7, Residential Cottages & Temporary Camp
bldgs. 3/2/40nas
-
nas132.jpg - Dormitories P-11 & P-12 100% complete. P-14, 80%. Messhall P-6, Admin
bldg P-1, and Road Construction in Area "D". 3/2/40
-
nas133.jpg - Motor test bldg area completed to grade. Grading operations, in cut on Road
"A". 3/2/40
-
nas134.jpg - Storage area showing machine shop S-2, 60%; Spillway and power line to
Nymans Peninsula. 3/2/40
-
nas135.jpg - Warehouse S-11, 100% complete and two-step bulkhead. 3/2/40
-
nas136.jpg - Filling of area from Roads "A" and "C". 3/16/40
-
nas137.jpg - View showing P&H shovel, RD-8, Dumpster and trucks working in cut at approx
station 13 plus 90 on road "D". 3/2/40
-
nas138.jpg - Part of panorama showing progress of fill on Road "A" towards administrative
area. 3/15/40
-
nas139.jpg - Part of panorama showing dredge Everett working on cut for permanent pier
and the derrick operating with clamshell bucket prospecting bay bottom for type
of dredge material. 3/15/40.
-
nas140.jpg - Part of panorama showing progress on grading roads Area "D", framing for
laundry bldg P-4 and Dormitory P-13. 3/15/90
-
nas141.jpg - Part of panorama showing progress on excavation Road "A". 3/15/40
-
nas142.jpg - Progress in Cottage Area. 3/15/40
-
nas143.jpg - Part of panorama showing progress on cottages, BOC, draining ditch for Area
"D" in right center. 3/15/40
-
nas144.jpg - Grading Road "G" Area "D". 3/15/40
-
nas145.jpg - Grading Road "G" Area "D". 3/15/40
-
nas146.jpg - Machine shop building S-2. 3/15/40
-
nas147.jpg - Grading Road "G" Area "D". 3/15/40
-
nas148.jpg - Excavation of basement for MEMQ #5. 3/30/40
-
nas149.jpg - View looking ahead from tank location. 4/7/40
-
nas150.jpg - View looking back from "W" line station 35 plus 00 at Devils Creek crossing.
4/7/40
-
nas151.jpg - View looking back from point N20,655 E2,740 above "W" line station 80 plus
03. 4/7/40
-
nas152.jpg - View looking ahead from "W" line station 94 plus 00. 4/7/40
-
nas153.jpg - View looking back from "W" line station 94 plus 00. 4/7/40
-
nas154.jpg - Part of panorama showing Buskin Lake outlet taken from intersection of "W"
line and axis south bank. 4/7/40
-
nas155.jpg - Part of panorama showing Buskin Lake outlet taken from intersection of "W"
line and axis South Bank. 4/7/40
-
nas156.jpg - Buskin River view looking North along dam axis taken from point N27,590
W1,075. 4/7/40
-
nas157.jpg - Buskin River mouth looking North along dam axis taken from point N.27,500
W.1,075 on axis above "W" line. 4/7/40
-
nas158.jpg - Looking back at terrain from point N27,500 W715. Man marks line location.
4/7/40
-
nas159.jpg - View looking ahead from "W" line station 126 plus 79. 4/7/40.
-
nas160.jpg - View looking back from "W" line station 126 plus 79. 4/7/40
-
nas161.jpg - View looking back from "W" line station 113 plus 12 on Buskin River
crossing. 4/7/40.
-
nas162.jpg - Part of panorama Buskin Lake taken from point N27,500, w!,075 on South bank
above dam site. 4/7/40
-
nas163.jpg - Part of panorama Buskin Lake taken point N27,500, W1,075 on South bank
above dam site location. 4/7/40
-
nas164.jpg - Part of panorama Buskin Lake taken from point N27.500, W1,075 on South
bank above dam site location. 4/7/40
-
nas165.jpg - Part of panorama Buskin Lake taken from point N27,500, W1,075 on South
bank above dam site location. 4/7/40
-
nas166.jpg - View looking back from "W" line station 86 plus 14. River crossing on Buskin.
4/7/40
-
nas167.jpg - Foundation MEMQ-2 N'ly end showing curtain walls for kitchen porch being
carried down to bottom of excavation. 4/13/40
-
nas168.jpg - View of beaver dams and swamp condition existing South side river taken from
above station 84 plus 27. 4/7/40
-
nas169.jpg - Foundation MEMQ-1 S'ly wall wing temporary camp wood stave pipe beneath
footings. 16X16 pedestal forms to be placed under walls serv.porch.
4/13/40
-
nas170.jpg - Foundation MEMQ-1 N'ly end inside form for service porch curtain walls
showing eccentricity of previously poured footing. 4/13/40
-
nas171.jpg - Foundation MEMQ-1 S'ly end from interior. Exterior plywood panels in
vertical position with studs also vertical. 4/13/40
-
nas172.jpg - Foundation MEMQ-1 front elevation S'ly end showing poor waler. 4/13/40
-
nas173.jpg - Foundation MEMQ-1 front elevation N'ly end showing plywood panels in
vertical position with studs also vertical. 4/13/40
-
nas174.jpg - Foundation MEMQ-2 south wall of kitchen wing interior form with footing
dowels too close for proper coverage. 4/13/40
-
nas175.jpg - Looking south on Women's Bay. Scenic and reflective. 4/30/40
Hi rez 162k